SBVU073A november 2021 – june 2023 TPS7A14
This section describes the jumpers and connectors on the EVM, and how to properly connect, set up, and use the TPS7A14EVM-058 and TPS7A14EVM-096. Section 2.1 and Section 2.3 describe the test setup and operation for the TPS7A14 LDO. Section 2.2 and Section 2.4 describe the test setup and operation of the optional load transient circuit.