SLVUC49 April   2021 TPS51396A

 

  1. 1Trademarks
  2. 2Introduction
  3. 3Performance Specification Summary
  4. 4Schematic and List of Materials
  5. 5Board Layout
  6. 6Bench Test Setup conditions
    1. 6.1 Headers Description and Jumper Placement.
    2. 6.2 Power-Up Procedure
  7. 7Test Waveform
    1. 7.1 Power Up
    2. 7.2 Power Down
    3. 7.3 Output Voltage Ripple
    4. 7.4 Load Transient
    5. 7.5 Thermal

Headers Description and Jumper Placement.

The TPS51396AEVM header description is as Figure 6-1. A power supply capable of supplying greater than 4 A must be connected to J1 through a pair of 20-AWG wires or better. The load must be connected to J2 through a pair of 20-AWG wires or better. The maximum load current capability is 8 A. Wire lengths must be minimized to reduce losses in the wires. Test point TP2 provides a place to monitor the VIN input voltages with TP9 providing a convenient ground reference. TP3 is used to monitor the output voltage with TP11 as the ground reference.

GUID-20210427-CA0I-VJJ5-V2Z8-H9R8MXTLVQWL-low.svg Figure 6-1 Headers Description and Jumper Placement

Connector and test point description is as Table 6-1.

Table 6-1 Input and Output Connection
#FUNCTIONDESCRIPTION
J1VIN connectorVIN power
J2VOUT connectorVOUT power
J3Internal/external Soft Start selectionWhen short J3, IC uses external SS by charging the cap C6. When float J3, IC uses internal SS.
J4Enable controlMiddle pin is Buck Enable PIN. When this PIN is floating, the IC is disable. When the jumper short EN on, IC is enable. When the jumper short EN off, IC is disable.
J5Mode selectionThis EVM provides three kinds of mode. When short OOA, IC works with out of audio mode, frequency is 600kHz. When short ECO, IC works with pulse skip mode, frequency is 600kHz.
TP1VCC test pointTest VCC
TP2VIN test pointTest VIN
TP8/9/10/11/14/15/16GND connectorGround
TP4VIN connectorVIN power
TP12PGOOD test pointTest PGOOD
TP6SW test pointTest SW
TP5VOUT test pointTest VOUT
TP3VOUT connectorVOUT loading
TP7Loop test pointTest loop
TP13Enable test pointTest Enable signal