SLVUCX6 June 2024 TPSM828303
To operate the EVM, set jumpers JP1 and JP2 to the desired positions per Section 2.1.1. Connect the input supply to J1 between VIN and GND and connect the load to J2 between VOUT and GND. J3 can be left floating.