Figure 5-1 shows test setup
used for evaluating LM74502Q1EVM. Steps to be followed before testing the evaluation
module are:
- Connect the power supply and load to LM74502Q1EVM.
- Set the power supply output to 12 V and current limit to 5 A.
- Set load to 200 mA or a load value less than 5 A.
- Set the jumpers to default jumper setting as shown in Table 5-1.