SNOU192A December 2021 – December 2021 LM74502
Test setup used for evaluating LM74502EVM is shown in Figure 5-1. Steps to be followed before testing the evaluation module are:
Connect the power supply and load to LM74502EVM.
Set the power supply output to 12 V and current limit to 5 A.
Set load to 200 mA, or a load value less than 5 A.
Set the jumpers to default jumper setting as shown in Table 5-1.