In this build level the current loop
for the PFC is checked. Lab 6 is primarily meant for tuning the current loop and
optimizing its performance. It is always safe to start Lab 6 at low voltage and low
power as starting at higher power without a supervisory voltage loop can boost the
voltage due to overcurrent events and can blow away the switches. Hence, it is very
important to carefully set the TINV_idRef_pu variable so as to avoid overcurrent
trips and high voltages at the DC terminals. Also the TINV_idRef_pu is defined with
a negative sign for PFC mode of operation and with a positive sign for inverter mode
of operation.
Figure 3-21 describes the software flow for running Lab 6.
Set the project to Lab 6 by changing
the Lab Number in the <settings.h> file, (this is changed by powerSUITE GUI
when using powerSUITE project)
In the user settings.h file some
additional options are available, but the following are used for the tests
documented in this user guide.
#if TINV_LAB == 6
#define TINV_TEST_SETUP TINV_TEST_SETUP_RES_LOAD
#define TINV_PROTECTION TINV_PROTECTION_ENABLED
#define TINV_SFRA_TYPE TINV_SFRA_CURRENT
#define TINV_SFRA_AMPLITUDE (float32_t)TINV_SFRA_INJECTION_AMPLITUDE_LEVEL2
#define TINV_POWERFLOW_MODE TINV_RECTIFIERER_MODE
#define TINV_DC_CHECK 0
#define TINV_SPLL_TYPE TINV_SPLL_SRF
#endif
In this check the SW is run on the
hardware, or the HIL platform, or both.
Refer to the hardware test set up section for actual details of the equipment used
for configuring the test. Do not supply any HV power yet to the board.
- First launch the main.cfg and
select Lab 6 in the project options. The compensator style (PI compensator) and
the tuning loop (current loop) is automatically populated. Now click run
compensation designer icon and compensation designer tool launches, with the
model of the current loop plant with parameters specified on the powerSUITE
page.
- The current compensator coefficients used for running the control loop are shown
in the following code. The user can modify these coefficients to meet the
necessary loop bandwidth and phase margin. The ideal coefficients with resistive
load are slightly different than the one used for grid connection because the
grid impedance is very low. The compensator design transfer function and
response are shown in Figure 3-22.
#define TINV_GI_PI_KP ((float32_t)0.3))
#define TINV_GI_PI_KI ((float32_t)0.0120860479))
- Once satisfied with the
proportional and integral gain values, click on Save COMP. This saves the
compensator values into the project. Close the Compensation Designer, and return
to the powerSUITE page.
- Turn on the auxiliary power supply and set it to 15 V. Build and load the code,
use the lab6.js file to populate the watch variables in the CCS window.
- Set the load resistance to a high value 3.18 kΩ.
- Set the AC input voltage to 30 VRMS with appropriate current
limit.
- After turning on the AC power
supply, immediately turn on the relay by writing a 1 to TINV_allRelaySet. Make
sure that the relay is turned on immediately (within 3-4 seconds) after turning
on the ac supply.
- Set TINV_idRef_pu to –0.013 pu
- To start the PFC mode, enter "1"
on TINV_startPowerStage variable, the current should now be drawn from the grid
as a sinusoidal signal (with some harmonics as it is at low power) and boost
action seen on the vBus. The output voltage boosts from 75 V to around 180 V as
shown in Figure 3-23.
- The current becomes sinusoidal
as the load is increased. This verifies start up of PFC at 30
VRMS.
- The Figure 3-23
shows PFC closed current loop start up at 30 VRMS. Scope
signals: Channel 1 - AC voltage (blue), Channel 2- DC voltage (light
green), Channel 3 - AC current (dark green).
- Now repeat the previous steps to verify start up at 220 VRMS.
At
220 VRMS, with the TINV_idRef_pu set to –0.013 pu, the bus
voltage jumps from 550 V to 640 V at 155 W power as Figure 3-24
shows.
- Figure 3-24 shows
PFC closed current loop start up at 220 VRMS. Scope signals:
Channel 1 - AC voltage (blue), Channel 2 - DC voltage (light green), Channel 3 -
AC current (dark green)
- As Figure 3-24
shows, running this lab at higher input voltage without a supervisory voltage
loop results in big overvoltage across the DC terminals. Hence it is always
advisable to start this lab at low voltage and low power as previously described
for safety reasons and then slowly ramp to the desired voltage for closed
current loop tuning. Starting at 230-VRMS AC input voltage and
boosting DC voltage to 800 V directly is shown in Lab 7.
- In case any overcurrent trip is observed which causes the PWMs to switch off,
please refer the notes in Lab 5 to debug this condition.
- A soft start scheme is
implemented at the start-up to make sure overcurrents are reduced at start-up.
For this the duty is restricted to the PWM module by adjusting the dead band set
Figure 3-25 shows the PWM configuration for this setup where the dead band is set to
large value and slowly reduced to the nominal value to limit the current spikes.
- SFRA is integrated in the
software of this lab to verify the designed compensator provides enough gain and
phase margin by measuring on hardware. To run the SFRA keep the project running,
and from the cfg page, click on the SFRA icon. SFRA GUI pops up.
- Select the options for the device on the SFRA GUI. For example, for F28377D
select floating point. Click on Setup Connection. On the pop-up window
uncheck the boot on connect option, and select an appropriate COM port. Click
OK. Return to the SFRA GUI, and click Connect.
- The SFRA GUI connects to the
device. A SFRA sweep can now be started by clicking Start Sweep. The complete
SFRA sweep takes a few minutes to finish. Activity can be monitored by seeing
the progress bar on the SFRA GUI and also checking the flashing of blue LED on
the back on the control card that indicates UART activity. Once complete, a
graph with the open loop plot appears, as in Figure 3-28 and Figure 3-29 which corresponds to plant and loop response measured by SFRA GUI
respectively. This verifies that the designed compensator is indeed stable
- The frequency response data is also saved in the project folder under an SFRA
data folder and is time stamped with the time of the SFRA run.
- This completes verification of Lab 6.