JAJSHS0C March 2019 – March 2021 TPS92682-Q1
PRODUCTION DATA
The recommended slope compensation magnitude can be obtained from Equation 14, VSLP ≥ 100 mV.
The VSLP can be programmed in the ISLOP Register. The ISLOPE =011 is selected, which corresponds with VSLP = 150 mV.