SLUUC66B May 2020 – April 2021 TPSM5D1806
Wire-loop test points and scope probe sockets are included for digital voltmeters (DVM) or oscilloscope probes to aid in the evaluation of the device. A description of each test point follows:
Name(1) | Description |
---|---|
VIN S+ | Input voltage monitor. Connect the positive lead of a DVM to this point for measuring efficiency. |
VIN S- | Input voltage monitor. Connect the negative lead of a DVM to this point for measuring efficiency. |
VOUT1 S+ | Output 1 voltage monitor. Connect the positive lead of a DVM to this point for measuring efficiency, line regulation and load regulation. |
VOUT1 S- | Output 1 voltage monitor. Connect the negative lead of a DVM to this point for measuring efficiency, line regulation and load regulation. |
VOUT2 S+ | Output 2 voltage monitor. Connect the positive lead of a DVM to this point for measuring efficiency, line regulation and load regulation. |
VOUT2 S- | Output 2 voltage monitor. Connect the negative lead of a DVM to this point for measuring efficiency, line regulation and load regulation. |
VOUT3 S+ | Output 3 voltage monitor. Connect the positive lead of a DVM to this point for measuring efficiency, line regulation and load regulation. |
VOUT3 S- | Output 3 voltage monitor. Connect the negative lead of a DVM to this point for measuring efficiency, line regulation and load regulation. |
AGND | Analog ground test point. |
PGND | Power ground test point. |
VOUT SCOPE (J2, J9, J14) | Output voltage scope monitor. Connect an oscilloscope probe to this set of points to measure output ripple voltage and transient response. |
ENABLE (J5, J8, J15) | For ease of use, J13 can be set in the ON position to enable the device or in the OFF position to disable the device. |
PGOOD1 | Monitors the power good signal of Channel 1 output. This is an open drain signal. |
PGOOD2 | Monitors the power good signal of Channel 2 output. This is an open drain signal. |
PGOOD3 | Monitors the power good signal of Channel 3 output. This is an open drain signal. |
SYNC1&2 | Synchronization input test point of U1. When synchronizing to an external clock connect to this test point. |
SYNC 3 | Synchronization input test point of U2. When synchronizing to an external clock connect to this test point. |