SLUUCF8 March 2021 TPS53676
This EVM supports testing of both rails (RAILA and RAILB). The maximum number of phases available for RAIL A is seven phases and for RAILB is two phases. PWM6 and PWM7 pins share control for both rails. The GUI allows the user to enable or disable phases. (see Figure 7-8) See also the TPS53676 data sheet for more details. Select the jumper settings for phase configuration 7+0,6+1,5+2 as shown in Table 4-1 and Table 4-2.
Phase configuration | R24 | R26 | R27 | R28 | R195 | R197 | R203 | R204 |
---|---|---|---|---|---|---|---|---|
7+0 | DNP | DNP | DNP | DNP | Populate | Populate | Populate | Populate |
6+1(Default) | Populate | DNP | DNP | Populate | Populate | Populate | DNP | DNP |
5+2 | Populate | Populate | Populate | Populate | DNP | DNP | DNP | DNP |
Phase configuration | Jumper J10 | Jumper J11 | Jumper J12 | Jumper J13 |
---|---|---|---|---|
7+0 (Default) | 1-2 short | 1-2 short | 1-2 short | 1-2 short |
6+1 | 1-2 short | 1-2 short | 2-3 short | 2-3 short |
5+2 | 2-3 short | 2-3 short | 2-3 short | 2-3 short |